The final phase....................
|
|
|
|
|
|
|
When one sign is just not enough ! |
Network rail limit, "shunt" signal |
|
All pedestrian crossing have location signs |
Anti pedestrian rubber matting at pedestrian crossing. |
The first test train arrived in Donnington on the 10th Feb 2009.
Photos of the arrival can be seen here and here
And Press coverage here.
Back to